KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
' style=
Date:  11-7-2017
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Lowered Onto Gear

Lifted the fuselage off of the workbench using the overhead hoist, slid the work bench out from under the fuselage, and lowered the fuselage onto the landing gear. Placed a saw horse under the tail to support the fuselage until the engine is hung. (Without the engine the plane is tail heavy.)
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.