KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
' style=
Date:  10-19-2017
Number of Hours:  7.50
Manual Reference:  
Brief Description:  Nosewheel Fairing & Gear Leg Fairing

Completed the nose wheel fairing by removing it and cleaning up the epoxy-flox placed around the fairing brackets yesterday. Installed all of the nut plates to attach the fairing brackets and to connect the front and rear parts of the fairing. Installed the nose wheel fairing to the nose wheel.

Started fabrication of the main gear leg fairings. Had to get the Trim Template (page 48-13) enlarged to 103% as it was small as included in the drawings from Van's. Trimmed both fairings creating U-1017A-R and U-1017A-L.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.