KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
' style=
Date:  12-12-2019
Number of Hours:  3.25
Manual Reference:  
Brief Description:  Installed GTP 59 OAT. Begin fitting Pitot Tube

Installed the GTP 59 Outside Air Temp probe in the left wing using the hole and wiring previously installed. Installed 2 hatch plates in the bottom of the left wing, leaving the hatch at the aileron bell crank open for the Airworthyness inspection.

Began fitting the Pitot tube to the Pitot mast installed prior to wing closure. There were no mounting holes in the mast, so had to carefully measure for the 4 small mounting holes that need to match up with the threaded holes in the Garmin Pitot/AOA
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.