KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
' style=
Date:  8-12-2019
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Completed G5 Wiring, Epoxy Sealed Lower Cowl

Completed the G5 wiring by installing the pins into the DB connector and connector back shell. Tested the wiring by powering up the G3X system and comfirming communications with the G5 and the G5 display operational.

Sealed the inside of the bottom cowl by painting it with epoxy with whiite tint.

[Cataract Surgery tomorrow, so no work for a week]
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.