Date:  4-22-2019
Number of Hours:  6.25
Manual Reference:  
Brief Description:  Power & Switch Wiring, Seat Heater Switches

Completed wiring for the back light LEDs on the panel switches.

Started through wiring diagrams and identifying wiring that can be installed to circuit breakers before installing panel in aircraft. Installed those wires and/or installed crimp rings for connection to circuit breakers.

Began running wires to panel switches that could be installed now, and installing stake-on crimp terminals. Installed the flap switch and wires to it.

Installed the seat heater switches and the power connections with in-line fuses for the seat heaters. Will need to get a 4 pole connector for each switch to allow the lower breaker/switch panel to be easily removed for maintenance.