Measured, cut, & installed on board the power and ground conductors for the CO Detector and the IBBS.
Soldered as required, installed pins, and assembled the connector (P-IBBS) for the IBBS unit.
Cleaned up the wire bundles including the main wire bundle, tieing them temporarily with zip-ties. (Will install permanent ties using waxed thread once bundles are in-place.)
Revised wiring diagrams with changes and notations made while assembling wire harnesses (e.g. as-built).
Next step will be to transfer wire harnesses from layout board to the panel and connect power conductors to circuit breakers and connect panel switches.