Powered By Kitlog Pro v2.0
Dave's RV-10 Build Log
RV-10
Air Conditioner
6-11-2020
< Previous Log Entry
Next Log Entry >
Date:
6-11-2020
Number of Hours:
2.00
Manual Reference:
Brief Description:
Re-Install Cowl & Covers after A/C Charging
Re-installed the top baggage bulk head cover after tying up the wires to the A/C sensors.
Re-installed A/C condenser hatch covers and tunnel cover.
Re-installed the engine cowl and snorkle.
Completed detailed pre-flight inspection.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
603
3188
Air Conditioner
22
95
Avionics
137
757
Electrical
30
143
Empennage
46
271
Engine
9
38
Finishing Kit
115
568
Firewall Forward
51
273
Fuselage
106
545
Miscellaneous
38
192
Phase 1
3
14
Shop Supplies
3
10
Tools
1
1
Wings
32
209
Wings & Fuselage
10
72
Copyright © 2001-2024 Matronics. All Rights Reserved.