KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
' style=
Date:  6-8-2020
Number of Hours:  5.50
Manual Reference:  
Brief Description:  Final A/C Hook-up

Removed cowl and top baggage bulkhead to access A/C hoses and equipment. Removed hatch covers for access to condensor fittings. Had to remove a tunnel cover to access 2 screws on each hatch cover.

Connected A/C hoses at compressor and firewall. Had about 2-3 oz. of oil leak out of compressor intake port when removed seals. Poured all but about 1 oz. back into the compressor intake hose before installing. (The remainder spilled while pouring.) Used oil remaining captured oil in bottom of cup to lube o-rings before installing on each hose fitting.

Counter sunk screw holes in scoop. Installed thermostatic cut-out switch and high/low pressure cut-out switch. Terminated wires AC-C6, AC-C7, and AC-C8 and connected to switches.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.