Brief Description: Front Floor, Brake Lines, Wiring Holes
Added additional RTV to wings wiriing and conduit.
Riveted the front floor panels into place per plans. (Sound insulation added beneath the floor panels last week.
Enlarged the small hole in fuselage sides for wing wiring to 3/4 inch, then added 2 addtional holes each side for additional wing wiring and pitot/AOA tubing. De-burred the wiring/conduit holes drilled last week along the sides of the fuselage.
Fabricated and installed the 2 brake lines that run from the center tunnel bulkhead fittings to the fittings that run through the floor at the main landing gear legs.