KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
' style=
Date:  10-23-2019
Number of Hours:  7.00
Manual Reference:  
Brief Description:  Cut Left Stick, Installed Antennas & Baggage Seal

Cut down the left control stick by 2 inches at the top and 1/2 inch at the bottom in the same fashion as the right stick. It appears that I may still need to do a small amount of adjustment of the elevator control linkage at the bottom of the stick to move the top of the stick back another 1/2 inch to avoid interference with the flap switch at full nose down elevator positions.

Installed new weather stripping on the baggage door.

Installed all of the antennas to the fuselage (COM 1, COM 2, GPS/XM, GTN 650 GPS, and ELT). This required removal of the empenage fairing to allow me to reach the bottom nut on the ELT antenna from behind. I made up a new RG-400 coax cable to run between the ELT and its antenna. I also had to remove the AC Fan SCAT tubing from the connection at the rear baggage bulkhead to reach a couple of the screws/nuts on the COM 1 antenna, then replaced it after the antenna was in place.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.