Powered By Kitlog Pro v2.0
Dave's RV-10 Build Log
RV-10
Miscellaneous
9-24-2019
< Previous Log Entry
Next Log Entry >
Date:
9-24-2019
Number of Hours:
4.50
Manual Reference:
Brief Description:
Moved Shelves to Airport
Disassembled the 2 shelving units and moved them to the airport in my car. Didn't have room for 3 of the shelf boards, so will move those tomorrow.
Swept up and cleaned up a portion of the shop. Loaded a few of the small things we left behind into the car and moved those to the airport.
Reassembled the shelving units at KARM and slid them into the back corner along the back wall.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
603
3188
Air Conditioner
22
95
Avionics
137
757
Electrical
30
143
Empennage
46
271
Engine
9
38
Finishing Kit
115
568
Firewall Forward
51
273
Fuselage
106
545
Miscellaneous
38
192
Phase 1
3
14
Shop Supplies
3
10
Tools
1
1
Wings
32
209
Wings & Fuselage
10
72
Copyright © 2001-2024 Matronics. All Rights Reserved.