KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
' style=
Date:  9-9-2019
Number of Hours:  7.50
Manual Reference:  
Brief Description:  Reinstall Panels, Wired Sure Start, Install Heater

Re-installed the left lower side panel (with the parking brake & alt. air knobs). Re-installed the lower center panel section with the circuit breakers and switches.

Wired the Sure Start to the starter relay and left magnito.

Back riveted the VA-178D fuel selector indexing plate to the center control console.

Installed SCAT tubing for the heater on the right side of the engine, between the baffle and heat muff and between the heat muff and the heater valve. Installed the SCAT tubing from the left side heat muff to the left heater valve. Determined that the heater inlet port installed in the left cowl inlet will not work with the air conditioning compressor in the way. Cut a new hole for the inlet further back on the inlet ramp, and cut a cover plate for the original hole. Need to pick up aluminum screen and RTV before installing.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.