KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
' style=
Date:  6-24-2016
Number of Hours:  6.50
Manual Reference:  
Brief Description:  Attached Horiz. & Vert. Stab. to Tail Cone

Mounted the horiz. stab. to the tail cone. Made sure alignment was still correct (took minor adjustment prior to tightening bolts).
Mounted vert. stab. to tail cone, drilling mounting holes. Removed, deburred, and re-attached vert. stab. Obtained aluminum anti-seize from auto parts store for use on Vertical Stabilizer Front Spar and VS-1016 Vertical Stabilizer Front Spar Attach Bracket, and bolted together.
Re-installed elevators. Had difficulty inserting the bolt through both elevator horns and the elevator center bearing with all spacing washers. Removed bolt and ground a taper on the end to make insertion easier, while still maintaining >3 threads beyond the nut when properly torqued.

Marisa assisted in the morning only.
' style=

Horiz. & Vert. Stabs Mounted

Horiz. & Vert. Stabs Mounted

' style=

Horiz. Stab. with Elevators

Horiz. Stab. with Elevators

' style=

Difficult Bearing Attach Bolt

Difficult Bearing Attach Bolt

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.