Brief Description: Vertical Stabilizer Structure Fab
Began fabrication of structural spars for Vertical Stabilizer: - Clamped and match drilled holes thru stiffening spar caps; #30 first, followed by deburing, reassembly, and drilling #40 match holes thru flanges. - Disassemble and debur #40 holes, then reassemble - Countersike spar doubler and cleco, prepared for riveting tomorrow.