Powered By Kitlog Pro v2.0
Dave's RV-10 Build Log
RV-10
Empennage
3-2-2016
< Previous Log Entry
Next Log Entry >
Date:
3-2-2016
Number of Hours:
8.25
Manual Reference:
Brief Description:
Elevator
Continued Elevators Build:
- Squeezed edge rivets
- Drove rivets to join rigs inside elevators
- Trim Tabs prepared (by Phil)
- Glued foam wedges inside trim tabs using CS-3204 B2
- Glued foam wedges inside trailing edges
- Glued trailing edges with structural adhesive (AeroPoxy ES6228 B) and secured to aluminum angle with clecos
Begin work on Horizontal Stabilizer:
- Installed mail spar doubler for Horizontal Stabilizer with rivets
- Prepared to install clip on main spar
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
603
3188
Air Conditioner
22
95
Avionics
137
757
Electrical
30
143
Empennage
46
271
Engine
9
38
Finishing Kit
115
568
Firewall Forward
51
273
Fuselage
106
545
Miscellaneous
38
192
Phase 1
3
14
Shop Supplies
3
10
Tools
1
1
Wings
32
209
Wings & Fuselage
10
72
Copyright © 2001-2024 Matronics. All Rights Reserved.