KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
< Previous Log Entry          Next Log Entry >
' style=
Date:  5-13-2020
Number of Hours:  6.50
Manual Reference:  
Brief Description:  Installed Wheel Fairings

Installed wheel pants on all 3 wheels. Installed gear leg fairings on main gear legs. Installed interface fairings on main gear legs. Had to drill larger #28 holes and countersink for attachment screws on the interface fairings. (Had match drilled the install screw holes as #40 and attached the nut plates to the wheel pants and rivnuts to the fuselage bottom, but didn't drill out the holes in the interface fairings for the mounting screws.)

In order to install the nose gear fairing, had to remove the snorkle. Had to trim the fairing to eliminate interference with the center rear support plate F-10108B. Installed the nose gear fairing. Re-installed the snorkle.
' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.