KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
' style=
Date:  1-7-2020
Number of Hours:  4.25
Manual Reference:  
Brief Description:  Cut Mats, Installed Covers, "Experimental" Label I

Cut and installed temporary mats for the baggage area and back seat floor from extra interlocking rubber floor mats (from Harbor Freight).

Installed rear tunnel cover in the baggage area as there is nothing in this area requiring inspection by the DAR.

Temporarily installed the empenage fairing for weight & balance and initial engine run. (Will have to remove it for DAR inspection.)

Installed the 2" high "Experimental" label (purchased from Aircraft Engravers) onto the upper baggage bulkhead.

Cut 1" x 3" aluminum strips for use when gluing the door seals (Pg. 45-17, step 3)
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.