Powered By Kitlog Pro v2.0
Dave's RV-10 Build Log
RV-10
All
1-7-2020
< Previous Log Entry
Next Log Entry >
Date:
1-7-2020
Number of Hours:
4.25
Manual Reference:
Brief Description:
Cut Mats, Installed Covers, "Experimental" Label I
Cut and installed temporary mats for the baggage area and back seat floor from extra interlocking rubber floor mats (from Harbor Freight).
Installed rear tunnel cover in the baggage area as there is nothing in this area requiring inspection by the DAR.
Temporarily installed the empenage fairing for weight & balance and initial engine run. (Will have to remove it for DAR inspection.)
Installed the 2" high "Experimental" label (purchased from Aircraft Engravers) onto the upper baggage bulkhead.
Cut 1" x 3" aluminum strips for use when gluing the door seals (Pg. 45-17, step 3)
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
603
3188
Air Conditioner
22
95
Avionics
137
757
Electrical
30
143
Empennage
46
271
Engine
9
38
Finishing Kit
115
568
Firewall Forward
51
273
Fuselage
106
545
Miscellaneous
38
192
Phase 1
3
14
Shop Supplies
3
10
Tools
1
1
Wings
32
209
Wings & Fuselage
10
72
Copyright © 2001-2024 Matronics. All Rights Reserved.