KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
' style=
Date:  10-1-2019
Number of Hours:  4.25
Manual Reference:  
Brief Description:  Cut Shelves and Cleaned Out Richmond Shop

Cut 2 plywood shelves 2' x 4' to use with the shelving units already moved to Wharton hanger, to replace the damaged particle board shelf, with a second as a spare for future replacement.

Cleaned out the remainder of material left in the shop at 2802 J Meyer Rd in Richmond, TX. Left excess lumber for the shop's owner (per agreement with Mr. Issa), hauled 3 large bags of cardboard to the Ft. Bend Recycling Center in Rosenberg, and hauled 2 large bags of non-recyclable trash home to dispose of with home trash pickup.

Cleaned the bathroom and swept the shop floor for final move out so that it was clean and ready to rent.

Turned in the key to Mr. Issa. The shop is no longer mine.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.