KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
' style=
Date:  6-25-2019
Number of Hours:  7.25
Manual Reference:  
Brief Description:  Right Panel: GAD 27 & GEA 24

Completed wiring of the GAD 27 connectors by adding in the additional wires previously run in the fuselage.

Ran new wires for the fuel level sensors since these float sensors are in the leading edge ahead of the main wing spar. Drillled 3/8" holes and installed an SB375-4 bushing in each side for the new wires.

Created the P244 plug for GEA 24 with 10 multi-conductor cables previously installed in the fuselage.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.