KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
' style=
Date:  4-9-2019
Number of Hours:  3.75
Manual Reference:  
Brief Description:  GAD 29; GSU 25 Wiring

Removed the pins from GAD 29 connector P292 that were installed with the wrong size pins yeterday. Cut the pins off and then installed the proper Pin Size 20 using the K-13-1 positioner, and re-installed the pins into the connector. Re-assembled the back shell onto the connector.

Measured, cut and routed power wires and CAN Bus wire for GSU 25 (ADHRS). Also installed 3 conductor shielded wire for the GTP 59 temperature probe, coiling most of the 25 ft. of cable to allow it to be run to the GTP 59 probe in the left wing after the panel is installed and the wings are installed.

Added drain wires, installed pins, and made up the GSU 25 connectors P251 and P252.

Took the afternoon off and went flying in my Grumman Traveler since it was a clear sunny day.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.