Date:  3-29-2019
Number of Hours:  4.75
Manual Reference:  
Brief Description:  MFD & PFD2 Wiring

Completed stripping the MFD wires and soldering drain wires to the shields and covering with heat shrink tubing. Soldered required splices for the G5 and CAN Bus wires and covered with heat shrink tubing.

Stripped each wire and crimped pins to each one. Inserted the pins into the MFD connector and installed the connector with wires into the back shell.

Measured, cut, and placed PFD2 wires onto the wiring layout board. Stripped wires, soldered shield wires, crimped wire pins to wires, and installed pins into PFD2 connector. Installed connector with wires into the back shell.

Didn't connect drain wires to back shells as waiting for the SS screws/split washers/flat washers specified by Garmin to be delivered from ACS.