KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
' style=
Date:  3-22-2019
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Measure & Create Harness Layout Board

Created a wiring harness layout board on cardboard.with masking tape. All wiring runs are at 1:1 scale and located along the main harness bundle.

Installed tie-wraps into the layout board at each of the take-off points from the main harness, and near the ends of each cable run. These will allow for holding the wire in place while placing wires into the bundle and fabricating the connectors for each of the LRUs.

Received the required crimp terminals for Aircraft Spruce, inventoried them, and sorted them into a new parts box (purchased from Harbor Freight).

Started to wire connections to the primary alternator circuit breaker, but found that I need longer screws for the sub-breakers in order to attach a ring connector along with the copper bus bar to the smaller sub-breakers. Will complete these work once the longer screws ordered yesterday arrive.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.