KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
' style=
Date:  1-24-2019
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Seat Heater Wiring

Installed 4 additional wires required for the left front seat heater.

Sanded down the fiberglass strip applied to the compressor bump out on Tuesday. Applied a first coat of stiff epoxy/micro mix to begin shaping the bump out.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.