KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
' style=
Date:  6-6-2018
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Avionics Wiring Diagrams Creation

Worked through confirming I have all the required LRUs included in my initial drawing pages. Used the high level LRU interconnect diagram created last year to identify the RS-232 and AIRINC connections required on each LRU's page. Developed the pin-out wiring for the GDU 640 PFD-1 and GTX 45R.

(Still recovering from fractured heel)
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.