KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
' style=
Date:  11-9-2017
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Panel Planning

Cross checked the planned switches and circuit breakers against each other and against the electrical drawing from another RV.

Reviewed preliminary layout against other possible panel options looking for an alternative to mounting the G5 above the glare shield.

(Waiting on Loctite 518 gasket sealant to arrive from Amazon before proceeding with the installation of the new oil filter block.)
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.