Powered By Kitlog Pro v2.0
Dave's RV-10 Build Log
RV-10
All
11-9-2017
< Previous Log Entry
Next Log Entry >
Date:
11-9-2017
Number of Hours:
3.00
Manual Reference:
Brief Description:
Panel Planning
Cross checked the planned switches and circuit breakers against each other and against the electrical drawing from another RV.
Reviewed preliminary layout against other possible panel options looking for an alternative to mounting the G5 above the glare shield.
(Waiting on Loctite 518 gasket sealant to arrive from Amazon before proceeding with the installation of the new oil filter block.)
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
603
3188
Air Conditioner
22
95
Avionics
137
757
Electrical
30
143
Empennage
46
271
Engine
9
38
Finishing Kit
115
568
Firewall Forward
51
273
Fuselage
106
545
Miscellaneous
38
192
Phase 1
3
14
Shop Supplies
3
10
Tools
1
1
Wings
32
209
Wings & Fuselage
10
72
Copyright © 2001-2024 Matronics. All Rights Reserved.