KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
' style=
Date:  10-30-2017
Number of Hours:  4.75
Manual Reference:  
Brief Description:  Gear Leg Fairings

Installed the hinge to the left main gear fairing. Slipped both fairings onto their respective gear legs.

Checked fit of the Van's provided intersection fairings and decided to wait until the RV-Bits intersection fairings arrive that I ordered from Cleaveland Tools.

Started to work in the nose gear fairing, but need to get the template reproduced at the proper size since the one provided with the project drawings is not to full scale.

Replaced the defective Shop Vac with a new one today.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.