KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
' style=
Date:  10-4-2017
Number of Hours:  3.75
Manual Reference:  
Brief Description:  Finished Windscreen & Prepared for Fuselage Liftin

Hand sanded the epoxy-micro applied to the top and side edges of the windscreen to fill the gap. Sanded to the electrical tape on the plexiglass and feathered to the fiberglass top. Removed the electrical tape and sanded the edge to feather with the plexiglass.

Prepared for lifting the fuselage by taping the elevators to the horizontal stabilizer at both ends and then covering the horizontal stabilizer/elevators with a moving blanket on each side, with a piece of water pipe 1/2" foam insulation split and placed onto the trailing edges to protect them. Will wrap the moving blankets tomorrow after buying moving stretch wrap.

Disconnected the elevators from the elevator push rod. Loosened the bolts holding the horizontal stabilizer to the tail cone, but left the bolts in place. Will remove them when I have assistance to remove the stabilizer and lift the fuselage onto a work bench for work on the landing gear.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.