KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
' style=
Date:  7-31-2017
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Planning for Panel Avionics Order

Developed a detailed list of Garmin components by part number for the full avionics system. Included the install/connection kits in the list.

Determined the breaker sizes for all the Garmin LRUs from the installation manuals and developed a list of circuit breakers to be installed in the control panel.

Developed a list of the switches to be installed in the panel, grouping them by function and location in the panel.

Converted the above lists into pdf files and attached them along with the previously developed LRU diagram in an email to Jason at Aerotronics with a request for an estimate so the order can be placed with Garmin in time to obtain the rebates available from attending G3X forums at AirVenture.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.