With the A/C hose guides installed yesterday, did final routing of hoses to the firewall and then cut to proper length and crimped the 90 deg. fittings to both ends of the 2 hoses.
This completes all the hose connections within the fuselage except for the one missing fitting for the short #6 hose that runs from the dryer to the evaporator inlet.