Brief Description: Inventoried Parts & Developed Wiring Reqmts
Unpacked, inventoried, and put away hardware and wire received from Aircraft Spruce.
Developed requirements for power wiring to be run down the left side of the fuselage in 2 conduits. (Will run the low power signal wiring down the right side.)
Got a very late start today due to tornado warnings and tornadoes in the area.