KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
' style=
Date:  2-10-2017
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Cabin Top Vertical Support Post

Installed the powder coated vertical support between the cabin top and the panel glare screen, using 2 shims made from 0.035" aluminum scrap. Match drilled the holes into the fiberglass cabin top, then into the support angle in the panel support structure.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.