KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
' style=
Date:  9-6-2016
Number of Hours:  8.25
Manual Reference:  
Brief Description:  Fuel System

Installed the standard Van's fuel selector valve in the fuselage. Not sure how this valve and location will work with the Aerosport center console that I intend to use.

Fabricated fuel lines from the fuel valve to the bulkhead fittings in the tunnel, and then from the bulkhead fittings our the side skins for connection to the wings.

Ordered the fuel pump and filter from Van's today, and will complete that portion of the fuel system once I receive it.

Separated the rudder brake peddle parts and de-burred them with the Scotchbrite wheel on the grinder.
' style=

Fuel Lines Down Tunnel

Fuel Lines Down Tunnel

' style=

Fuel & Brake Lines to Side Wall

Fuel & Brake Lines to Side Wall

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.