KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
' style=
Date:  8-23-2016
Number of Hours:  6.50
Manual Reference:  
Brief Description:  Install Conduit in Fuselage

Installed 6 conduits, 3 per side from tail cone under baggage floor and rear seats then up the sides. Used Van's conduit, and installed pull a string in each conduit to use to pull in wires and A/C tubing in future.
Drilled 2 holes each in left and right ribs and in under seat floors for routing conduit from under floor to side wall spaces.
Secured conduit in bulkhead lightening holes with tie-wraps and aluminum stand-offs made from short lengths of 1/4" tubing (from brake lines tubing).
Used RTV to secure conduit in rear holes.
' style=

Conduits with Alum. Standoff

Conduits with Alum. Standoff

' style=

Conduit Under Baggage Floor

Conduit Under Baggage Floor

' style=

Conduit Under Rear Seat

Conduit Under Rear Seat

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.