KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
' style=
Date:  3-8-2016
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Roll Elevator Leading Edges

Finished up Elevators leading edges
- Roll leading edges using 1" steel pipe and vice grips
- Cleco, match drill, & debur
- Install blind rivets with pneumatic rivet puller. (Had to drill out one rivet that was not set flush and re-rivet)
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.