KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
' style=
Date:  3-3-2016
Number of Hours:  3.20
Manual Reference:  
Brief Description:  Vertical Stabilizer Structure Fab

Began fabrication of structural spars for Vertical Stabilizer:
- Clamped and match drilled holes thru stiffening spar caps; #30 first, followed by deburing, reassembly, and drilling #40 match holes thru flanges.
- Disassemble and debur #40 holes, then reassemble
- Countersike spar doubler and cleco, prepared for riveting tomorrow.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.