KitLog pro

Powered By Kitlog Pro v2.0

Darrins Web Site
' style=
Date:  2-13-2020
Number of Hours:  1.00
Manual Reference:  75-S
Brief Description:  Slats

Had A ding in the Slat (75S-3) rubbed it out with a Spoon and oil,
Measured Doubler 75S-6
' style=

removing ding

removing ding

' style=

measure dubler

measure dubler

' style=

Drilled frist #40 hole in doubler

Drilled frist #40 hole in doubler

' style=










Copyright © 2001-2020 Matronics. All Rights Reserved.