KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Tip-up QB build project
< Previous Log Entry          Next Log Entry >
' style=
Date:  2-7-2012
Number of Hours:  8.50
Manual Reference:  
Brief Description:  More battery box, Boost pump housing

More work on the battery 'box', box was trimmed to fit better in it's space on the firewall, the lightening holes were resized and cleaned up and deburred, the retaining strap was fabricated from flat bar. Began assembly of the boost pump housing structure and made the necessary modifications to the existing cover/s to accomodate the boost pump assembly. Cleco'd then match-drilled the parts and cut the breather holes as per DWG-OP21.
' style=





' style=




' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.