KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Tip-up QB build project
< Previous Log Entry          Next Log Entry >
' style=
Date:  11-22-2011
Number of Hours:  10.50
Manual Reference:  
Brief Description:  Panel layout researched and tried, Visited fellow

Second oanel layout was tested and panel fitted, in discussion with Willem panel was researched and posted online for comment and critique.Problems encountered were how to allow for a future audio panel installation and the mapbox just didn't fit. Some time spent on designing and researching a mapbox modification that would allow our intended layout, this included a vertical installation of the mapbox or/and shortening

Willem suggested moving the mapbox to the center removable sub panel and then locating the 2 8" screens either side perfectly aligned with the eyeline vertically and horizontally. Spent the evening visiting a fellow builder where avionics and panel layout were discussed at length. Our revised and third layout was then decided on.
' style=

initial trial and fit of second layout

initial trial and fit of second layout

' style=

Ibeaton's electrical choices

Ibeaton's electrical choices

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.