KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Tip-up QB build project
' style=
Date:  1-15-2013
Number of Hours:  11.00
Manual Reference:  
Brief Description:  Match drilling and fit adjustments

having succsefully fitted the tip on the left wing I removed it to install the tip stiffener rib - although I decided not to install these previously, I found that the tip could not be properly fitted and drilled without it so after some trimming I glued it in place in the leading edge half of the tipand in from the edge about 25mm all round.

with the rib bonded in place I fitted the tip on the wing again and began final trimming to match-drill and per the instructions began match-drilling with a #40 from the leading edge, alternating top and bottom and checking fit an alignment after each hole...working towards the trailing edge.

Very happy with the fit and alignment at this stage.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.