KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Tip-up QB build project
' style=
Date:  12-20-2012
Number of Hours:  8.50
Manual Reference:  
Brief Description:  Avionics fitted and began sorting for installation

Today I started wor on the tip from where I left off but having bumped into Chris our electrics guru who is super keen to get going on our installations I shifted focus a bit onto the avionics installtions with a view to getting this completed as soon as the laser cut parts get back so Chris can get stuck in.

First was to find the best suitable location for the RDAC unit behind the main panel, as suggested by Chris and others I found a good spot structurally and practically for the unit on the sub-panel and match-drilled it for 4 cleco's for now, to be bolted later.

Also spent a ridiculous amount of time filing and opening the panel cutout to receive the gorgeous EFIS unit. Eventually got a great fit and 3 screws are all that is missing from being finally fitted.
I wanted the filthy workshop sorted so moved some stuff and packed away the tonsd of stuff I had lying around (again with a view to Chris' visit) so pushed the airplane out for some 'fresh air'.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.