KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Tip-up QB build project
' style=
Date:  10-16-2012
Number of Hours:  9.00
Manual Reference:  
Brief Description:  LW new conduit, skin riveting, practice riveting

Having finally come about a working solution for the conduit intersection and installation on the RW I applied the same and installed the remaining conduit in the LW with the same intersection location for the heated pitot wiring.

Also in expectation of the parts arriving tomorrow I preppared by final installing the pitot in place and routing the pitot lines appropriately to clear all linkages and wiring and to allow for clean sound unions to the 'Safeair' nylon hoses which will arrive tomorrow and will be routed through the ribbs to the root and ultimately 'snap joined' at the wing attachment to the rmeaining line into the controller box at the panel.

Practiced riveting on the rejected skin and struggled even with help - I got some advice to set the pressure right down and the gun set to it's lowest and had better luck and much better results on the skin so set a few more in the RW.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.