KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Tip-up QB build project
' style=
Date:  10-8-2012
Number of Hours:  6.50
Manual Reference:  
Brief Description:  RW.. refitted the tank and installtion of servo as

Having repaired the sheared bolt and broken platenuts on the spar I replaced the tank and put back all the screws, correctly torqued.
I could then finalize the roll servo installtion which I did - I had to make some adjustments to the brackets and spent quite a bit of time getting it right but got a good fit in the end and it all went in perfectly.

Next was the installtion of the arms and rods with adjustments for nuetral and foremost and aftmost positions in the swing of the bellcrank, these were determined and marked off.

Also installed the tie-down bolt permanently with a fixative.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.