KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Tip-up QB build project
' style=
Date:  8-17-2012
Number of Hours:  9.50
Manual Reference:  
Brief Description:  SP7 brckt fabricated, fitted..Pitch srvo instlled

Made up a mock bracket for the SP7 unit on the ribs in the forward cabin floor and from that cut and bent up a suitable bracket from discarded parts in .032 stock.

Final riveted the pitch servo brckt and installed it in place and then fitted and saftied the sctuator arm to the main pushrod as instructed in the drawings and then adjusted and secured the assembly.

Made some minor changes to the arrangment of the extension room for the wings and empenage work, which allows me to work on either wing and parts of the empennage at the same time.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.