KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Tip-up QB build project
' style=
Date:  7-30-2012
Number of Hours:  7.50
Manual Reference:  
Brief Description:  Protective edging, shroud and frame adjustment and

Continued edging the sharp metal edges of the airframe with a protective sheath I made up from fiberoptic cable system lines. I trimmed the length to fit the edge then pulled the pipe along a blade in the vice to slit it along it's length.

After some advice I re-fiotted the canopy frame and shroud and used the methods advised to 'pull' the frame into shape and into position now that the hinges were drilled, I was struggling to close and even the gaps of the skins and the frame to the fuselage sills bu eventually got a good fit.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.