KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Tip-up QB build project
' style=
Date:  7-2-2012
Number of Hours:  8.50
Manual Reference:  
Brief Description:  Jettison mech. re-installed, Canopy latch final in

With the jettison assembly finalized and all parts painted and modified succsesfully I re-installed the mechanism in place, adjusted it position to a neater fit and straigtened it up a bit, with all in place final drilled the arm and then installed all hardware and fasteners to finalize. Tested the system and made a final change in clearing away a small cutout from the arm to allow an even further swing to pull the pins completely clear of the hinges.

Re-installed all the finished canopy latch parts that had been painted and finalized. Several final installations in the mechanism were completed and the full system was assembled and tested with succsess.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.