KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Tip-up QB build project
' style=
Date:  6-14-2012
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Additional panel brackets, replaced bad rivets on

I had to drill out and then replace some bad rivet work on the deck after finalizing that last night. Fabricated the two panel attachment brackets I wasn't sure about since there was no mention of this step in the instruction manual but they were clearly indicated on both panel/deck drawings. Once fabricated I fitted, match drilled and then riveted with pop rivets since there is no access from inside the cabin.

Having sourced the supplies I need I began laying out and marking the static system installation and worked on modifications to the 'clips' to which the lines will be secured along the inside of the cabin under the longeron. I also measured out, marked and then punched the static port points on either side of the fuselage at the 4th buklhead station. The hose was marked and trimmed and the fittings identified and dry fitted on the table
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.