KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Tip-up QB build project
' style=
Date:  6-8-2012
Number of Hours:  9.00
Manual Reference:  
Brief Description:  L Vent installed, vent brackets made up,

Made up the left vent assembly starting with the vent bracket, fabricated from angle stock and trimmed to fit. Installed the vent and finalized the installation by connecting then securing the vent hose. I installed the panel and made the necessary adjustments until it fitted together with the vent in place. With the vent in place I match drilled the bracket to the fuz wall. I put cleco's in for now.

Did the last of the hand squeezable rivets on the deck structure. The remainder have to be set with the riet gun and preferably with help at the bucking bar.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.