KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Tip-up QB build project
' style=
Date:  2-1-2012
Number of Hours:  9.00
Manual Reference:  
Brief Description:  Fixed attach brackets, panel reinstall, interior c

After my long visit with ian I had to correct a few things, first was to adjust and bend the tank attach brackets as per a previously unknown drawing. This involved enlargin the 1/2 scale drawing to get an accurate 1:1 template for where the bend should go, removing the brackets and bending aft approx 5deg L and R. Reinstalled the front deck structure and panel for the final length adjustment and placement and installation of the whisperflow vents, drilled and cleco'd in place, required the panel being trimmed slightly to fit the vents properly. Re-mounted the engine mount to the firewall for a final fit which meant sealing all the mount points and bolts with sealant and drilling the final holes to size for the gear installation and additional mounting bolts.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.