KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Tip-up QB build project
' style=
Date:  1-23-2012
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Half-day, seats installed and harnesses installed.

Half day, 1.30 to 6.00, climbed in the fuz to bolt and torque the shoulder harness anchors in place, secured the seat harness cables to the anchor points left and right side, assembled the baggage bulkhead with the cables in place and made the final adjustments to the cable slots and guides. Unpacked and assembled the shoulder harnesses per the instructions and bolted the left and right harnesses to the cables with the seats in place to adjust length. Both were rolled up and packed in bags and hung in place to keep them safe and clean for the duration of the build. The seat harnesses were also assembled and dry fitted then packed away to wait for the final covered seat cushions to be in place.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.